PALMYRA PALM (Single Storey Terrace)
Types | Units of House | Wall Up Area / Unit (Internal) | Built Up Area / Unit (Internal & External) |
Land Size | |||
---|---|---|---|---|---|---|---|
M2 | Ft2 | M2 | Ft2 | Area (m2) | Land Point | ||
Palmyra Palm (Intermediate Unit) |
44 | 90.60 | 974.86 | 151.90 | 1,634.44 | 189.00 | 4.67 |
Palmyra Palm (Corner Unit-Front Entrance) |
11 | 90.60 | 974.86 | 210.46 | 2,264.59 | 310.5-351 | 7.67-8.67 |
Palmyra Palm (Corner Unit-Side Entrance) |
1 | 90.60 | 974.86 | 197.43 | 2,124.36 | 382.67-434.67 | 9.46-10.74 |
Specifications | |
---|---|
Structure | Reinforced concrete framework |
Walls | Cement brick and cement hollow block |
Roofing | Metal roofing sheet |
Ceiling Finishes | Asbestos free board to external ceiling Gypsum board to internal ceiling |
Floor Finishes | Ceramic tile finishing at Living, Dining, Kitchen, Bathroom, WC, Bedrooms, front entrance, patio and utility. Cement screed at Car Porch, Apron and Driveway |
Wall Finishes | Ceramic tile finishing to Kitchen only for wall at stove &sink area. Ceramic tile up to ceiling height for Bathroom &WC |
Paintings | Weathershield paint to external wall Emulsion paint to internal wall and ceiling |
Doors | Main door &Rear door: Solid Timber Door Bedroom door: Moulded Timber Door Bathroom door: Waterproof Plywood Door |
Windows | Natural anodised aluminium frame with green tinted glass panel |
Sanitary Fittings | Single-bowl kitchen sink with tap, water closet, hand wash basin with tap, shower set with flexible hose, shower tap &water tap |
Plumbing Services | Cold water plumbing system. |
Electrical Services | Concealed conduit and wiring with single phase meter: Lighting points x 13 nos (corner 15 nos) 13amp 1 gang socket point x 8 nos 13amp 2 gang socket point x 2 nos |
Fencing | 1.5m high chain link fencing |
Gate | 1.5m high mild steel main gate and rear gate with concrete gate post |
Progress
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ May 2016
@ January 2016
@ January 2016
@ January 2016
@ January 2016
@ January 2016: Behind Palmyra
@ January 2016: Latest Road Conditions
@ January 2016: Latest Road Conditions
@ August 2015: Building Structural works
@ June 2015: Building Structural Works
@ April 2015: Roofing in progress
@ February 2015: Building Structural Works
@ October 2014: Construction of Retaining Wall all completed
@ October 2014: Construction of foundation at Block B4
@ October 2014: Construction of column completed at Block B1 & B2
Enquiry
Fields indicated with () is required.
(Note: This form required Javascript to be enabled in order to make successful sending.)
Share With Friend
Fields indicated with () is required.
(Note: This form required Javascript to be enabled in order to make successful sending.)